Abstract
The scheduling of mixed-criticality (MC) systems with graceful degradation is considered, where LO-criticality tasks are guaranteed some service in HI mode in the form of minimum cumulative completion rates. First, we present an easy to implement admission-control procedure to determine which LO-criticality jobs to complete in HI mode. Then, we propose a demand-bound-function-based MC schedulability test that runs in pseudo-polynomial time for such systems under EDF-VD scheduling, wherein two virtual deadline setting heuristics are considered. Furthermore, we discuss a mechanism for the system to switch back from HI to LO mode and quantify the maximum time duration such recovery process would take. Finally, we show the effectiveness of our proposed method by experimental evaluation in comparison to state-of-the-art MC schedulers.
| Original language | American English |
|---|---|
| Journal | Proceedings of the 2018 IEEE Real-Time Systems Symposium (2018, Nashville, TN) |
| DOIs | |
| State | Published - Dec 1 2018 |
Keywords
- Criticality (nuclear fission)
- EDF-GVD
- Experimental evaluation
- Graceful degradation
- Interactive computer systems
- Mixed criticalities
- Polynomial approximation
- Real time systems
- Recovery process
- Response time (computer systems)
- Schedulability test
- Scheduling
- State of the art
- Uniprocessors
Disciplines
- Computer Sciences
Fingerprint
Dive into the research topics of 'Uniprocessor Mixed-Criticality Scheduling with Graceful Degradation by Completion Rate'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS