Skip to main navigation Skip to search Skip to main content

Preliminary Simulation of the GAP Mechanical System for Oil Sands Haulage

Research output: Contribution to journal › Article › peer-review

Abstract

Kinematic synthesis and dynamic simulation of the Ground Articulating Pipeline (GAP) system has been carried out with Automatic Dynamic Analysis of Mechanical Systems (ADAMS) software. A kinematics model of the GAP mechanism has been built based on the kinematics of machinery. The equations of Newton-Euler dynamics were employed as the computational framework for the dynamic simulation of the system. A virtual prototype has been created and simulated in the ADAMS environment. The simulation has been integrated with real time 3-D system for detailed and responsive interactions with dynamic virtual environments. The results of the kinematics synthesis showed that the GAP system consists of 14 pipe arms and seven master carriages to accommodate a shovel advance of 400 m per week. The results of the dynamic simulation showed that the GAP system meets the operating requirement of each slave master displacement of 60 m with good operating characteristics.

Original languageAmerican English
JournalInternational Journal of Mining, Reclamation and Environment
DOIs
StatePublished - Jan 1 2007

Keywords

  • Dynamic Modelling
  • Ground Articulating Pipeline
  • Mechanical System Simulation
  • Virtual Prototype

Disciplines

  • Mining Engineering

Fingerprint

Dive into the research topics of 'Preliminary Simulation of the GAP Mechanical System for Oil Sands Haulage'. Together they form a unique fingerprint.

Cite this