Abstract
In an earlier study, the authors introduced the new algorithm that allows for a definition of open pit limits taking into consideration time value of money. This study presents further expansion of this algorithm that allows determining the optimum mining sequence and optimum width of pushbacks, in a manner that maximises the net present value (NPV) of a deposit. The algorithm combines dynamic programming and mining heuristic, and allows for incorporation of price vectors, costs, cut-off grades and other mine design parameters. Test runs of the algorithm conducted by the authors have led consistently to pits and mining sequences with higher NPV values than those generated using parametric techniques. © 2013 Copyright Taylor and Francis Group, LLC.
| Original language | American English |
|---|---|
| Journal | International Journal of Mining, Reclamation and Environment |
| DOIs | |
| State | Published - Jan 1 2013 |
Keywords
- Long Range Mine Planning
- Mining Sequence
- NPV Optimisation
- Pit Limit Optimisation
- Pushbacks
Disciplines
- Mining Engineering
Fingerprint
Dive into the research topics of 'Optimising Open Pit Mine Scheduling Taking into Consideration Time Value of Money and Mining Restrictions'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS