Abstract
The size of the Boulder Canyon Project necessitated a broad array of innovations in construction engineering and management which had enormous impacts on all of the large scale projects that followed it. Major milestones were achieved in mass concrete handling and placement across a large and sometimes treacherous job site; equally challenging problems with forming and pouring structural concrete elements for the project, such as the intake towers, penstocks, spillways, and outlet works; steel penstock fabrication and placement; and establishment of basic job site safety precautions that became increasingly common thereafter, including on-site medical care the provision of hard hats to all workers.
| Original language | American English |
|---|---|
| Journal | Proceedings of the Hoover Dam 75th Anniversary History Symposium (2010, Las Vegas, NV) |
| DOIs | |
| State | Published - Oct 1 2010 |
Keywords
- Concrete Delivery
- Construction Engineering
- Job Site Safety
- Large-Scale Projects
- Mass Concrete
- Penstocks
- Steel Fabrication
- Steel Penstocks
- Structural Concretes
- Trenching
Disciplines
- Geology
Fingerprint
Dive into the research topics of 'Hoover Dam: Construction Milestones in Concrete Delivery and Placement, Steel Fabrication, and Job Site Safety'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS