Abstract
This paper calls for a project partnering contract that integrates the entire project team under a single multi-party document. A three-phase methodology study based on literature review, interviews with 21 senior industry practitioners, and subsequent associated analysis was utilized in order to meet the goal and objectives of this study. Under this research, a series of principles and guidelines were highlighted whereby the owner, contractor, suppliers, and manufacturers collaboratively work together under the same terms and conditions. Thus, the owner has to deal with only one integrated contract which substantially reduces the risk of gaps or overlaps between the different roles and creates duties of care between all team members. A partnering contract would never, on its own, change the culture and environment of the construction process and thus, strategic partnering should be promoted not only at project specific activities but at all organizational activities. It is perceived that that this research would hopefully lay basis and foster legal professionals towards drafting of the first standard U.S partnering contract, which should help in developing a more effective and efficient contracting environment.
| Original language | American English |
|---|---|
| Journal | Proceedings of the 2010 Construction Research Congress (2010, Banff, Alberta, Canada) |
| DOIs | |
| State | Published - May 1 2010 |
Keywords
- Construction process
- Literature reviews
- Project delivery
- Project partnering
- Project team
- Research
- Specific activity
- Standardization
- Strategic partnering
- Supply chain management
- Supply chains, Project management
- Team members
- Three-phase methodology, Construction
Disciplines
- Civil and Environmental Engineering
Fingerprint
Dive into the research topics of 'Guidelines for a Standard Project Partnering Contract'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS