Abstract
The costs to dispose of construction and demolition (C&D) wastes have risen sharply, forcing contractors to reevaluate waste disposal methods and choose whether to view C&D waste as simply as rubbish or as a resource. The basis for implementing a waste management plan (WMP) is derived both from a concern for protecting the environment and a concern for cost. Two issues must be addressed when analyzing C&D wastes. The first is, there must be an effective way to compare alternative methods of handling C&D waste. The second is that a contractor must be able to address the environmental conservation of C&D wastes without losing any competitive advantages that might discourage conservation and impact a company's overall economic performance.
| Original language | American English |
|---|---|
| Pages (from-to) | 77-86 |
| Number of pages | 10 |
| Journal | Proceedings of the 29th Mid-Atlantic Industrial and Hazardous Waste Conference (1997, Blacksburg, VA) |
| State | Published - Jul 1 1997 |
| Event | Proceedings of the 1997 29th Mid-Atlantic Industrial and Hazardous Waste Conference - Blacksburg, VA, USA Duration: Jul 13 1997 → Jul 16 1997 |
ASJC Scopus Subject Areas
- Industrial and Manufacturing Engineering
- Waste Management and Disposal
Keywords
- Cost effectiveness
- Demolition
- Environmental impact
- Environmental protection
- Industrial economics
- Land fill, Waste management, Industrial waste disposal
Disciplines
- Civil Engineering
Fingerprint
Dive into the research topics of 'Construction and Demolition Waste Management: Developing a Cost Effective Plan: Developing a cost effective plan'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS